Match the skip to the build
An 8-yard builders skip is often a useful starting point for accepted construction materials. Bulky lighter waste from strip-outs may suit a 14-yard option. Separate dense loads and ask about limits.
Keep waste streams clear
Identify timber, masonry, metal, packaging and gypsum-based materials before booking. Separate restricted materials where required. Do not put asbestos, chemicals or unidentified hazardous waste in a standard skip.
Plan a safe site position
Allow room for the skip lorry and keep workers away during delivery and uplift. Tell us about scaffolding, excavations, gates, overhead cables and public-road placement.
Support for repeat projects
For continuing work, discuss likely volumes, exchange requirements and dates with us. Give us the site contact and access restrictions so arrangements can be coordinated.
